2016 April
Fully guarded approach
On 15, Apr 2016 | In GMD News | By Stephen
After a routine H&S inspection, one of our customers was asked to provide extra perimeter guarding around a large production machine. A site survey was carried out, the basic design agreed, and then the guards were all designed, manufactured and installed within 2 weeks… just before the H&S follow-up visit.