Image Image Image Image Image
Scroll to Top

To Top

2016 July

17

Jul
2016

In GMD News

By Stephen

Going Underground

On 17, Jul 2016 | In GMD News | By Stephen

GMDesign Solutions were asked to design and detail a Door transport frame for one of the Maintenance departments for the London Underground Jubilee Line.

The trolley has 4 compartments; two for new door assemblies, and two for the old assemblies. The trolleys were made to speed up maintenance down-time and reduce manual handling issues.